Team Evaluation

Team Evaluation

Overall, I feel that the whole project could have gone a lot smoother. The main issue that we faced as a group was that we didn’t send our work to each other often enough. Looking back on the project the main fault was that work at the end was rushed simply trying to get things into the level. As it was late on in the project when we had a working level it was largely a case of simply adding in small parts of the brief to cover as much as possible.
I feel one way of improving on the assignment would be to send intricate saves so that we would both know exactly what point each of us was up to and also so that we would know that both of us were getting through the work and that one of us wasn’t slacking in the work.
The main area for the work that I did was the first area. I had planned to do more with it, and include voiceovers and sub titles. However I lost the time as my team mate had issues with the level and that took more time than planned.